| 000 | 01035nam a2200301 a 4500 | ||
|---|---|---|---|
| 005 | 20250930122839.0 | ||
| 008 | 070525s2004 my a f u f000 0 eng | | ||
| 020 | _cRM 10.00 | ||
| 039 | 9 |
_a200802151803 _brosnah _c200801181249 _drosnah _y05-25-2007 _zrohaina |
|
| 040 | _aUKM | ||
| 090 | _aMK11 SIRIM 17 MS1314 | ||
| 090 | _aMK11 SIRIM 17 MS 1314 Part 2 2004 | ||
| 245 | 0 | 0 |
_aPrecast concrete piles. _nPart 2 _pMethod for determination of bending strength of precast concrete piles (Bend Test) |
| 260 |
_aShah Alam : _bSIRIM Berhad, _c[2004] |
||
| 300 |
_aiii , 6p. : _bill. ; _c29 cm |
||
| 500 | _a(First Revision) | ||
| 650 | 0 | _aConcrete piling | |
| 650 | 0 | _aPrecast concrete construction | |
| 710 | 1 |
_aMalaysia. _bJabatan Standard _956610 |
|
| 710 | 2 |
_aSIRIM Berhad _950700 |
|
| 907 |
_a.b13932500 _b2021-11-18 _c2019-11-12 |
||
| 942 |
_c4 _n0 _kMK11 SIRIM 17 MS1314 |
||
| 914 | _avtls003349376 | ||
| 990 | _aross | ||
| 991 | _aKoleksi Dokumen | ||
| 998 |
_at _b2007-12-05 _cm _dpj _feng _gmy _y0 _z.b13932500 |
||
| 999 |
_c390095 _d390095 |
||