| 000 | 00932nam a2200277 a 4500 | ||
|---|---|---|---|
| 005 | 20250930090707.0 | ||
| 008 | 981208s1991 xxu 00 eng | ||
| 035 | _a780295 | ||
| 039 | 9 |
_a200405310809 _bmidah _y08-18-1999 _zload |
|
| 090 | _aHF5686.C8G73 1991 4 | ||
| 090 | _aHF5686 | ||
| 100 | 1 | _aGreenwood, Thomas G. | |
| 245 | 1 | 3 |
_aAn activity-based conceptual model for evaluating process cost information / _cThomas G. Greenwood |
| 260 |
_aKnoxville : _bUniversity of Tennessee Press, _c1991 |
||
| 300 |
_a540 p. ; _c22 cm. |
||
| 500 | _aThesis (Ph. D) - University of Tennessee, Knoxville, 1991 | ||
| 650 | 0 |
_aActivity-based costing _962175 |
|
| 650 | 0 | _aCost effectiveness | |
| 907 |
_a.b10018335 _b2020-10-12 _c2019-11-12 |
||
| 942 |
_c3 _n0 _kHF5686.C8G73 1991 4 |
||
| 998 |
_at _b1999-05-08 _cm _dx _feng _gxxu |
||
| 914 | _avtls000001972 | ||
| 990 | _ahe | ||
| 991 | _aFakulti Pengurusan Perniagaan | ||
| 999 |
_c3876 _d3876 |
||