| 000 | 01090nam a22002894a 4500 | ||
|---|---|---|---|
| 005 | 20250914131105.0 | ||
| 008 | 030929s2003 xxua b 001 0 eng | ||
| 020 |
_a0471358851 _cRM300.55 |
||
| 039 | 9 |
_a200311071232 _bnuri _c200310281331 _dhamzah _c200310271145 _dshai _c200309291807 _dzarina _y09-27-2003 _zjoriah |
|
| 090 | _aHD47.E58 | ||
| 090 | _aHD47 | ||
| 100 | 1 | _aEmblemsvag, Jan | |
| 245 | 1 | 0 |
_aLife-cycle costing : _busing activity-based costing and Monte Carlo methods to manage future costs and risks / _cJan Emblemsvag |
| 260 |
_aHoboken, N.J. : _bWiley, _c2003 |
||
| 300 |
_axvi, 320 p. : _bill. ; _c24 cm. |
||
| 504 | _aIncludes bibliographical references and index | ||
| 650 | 0 | _aCosts, Industrial | |
| 650 | 0 | _aLife cycle costing | |
| 650 | 0 | _aRisk management | |
| 856 | 4 | 1 |
_3Table of contents _uhttp://www.loc.gov/catdir/toc/wiley031/2002014328.html |
| 907 |
_a.b1326977x _b2021-05-28 _c2019-11-12 |
||
| 942 |
_c01 _n0 _kHD47.E58 |
||
| 914 | _avtls000341518 | ||
| 991 | _aJabatan Pemasaran | ||
| 998 |
_at _b2003-01-09 _cm _da _feng _gxxu _y0 _z.b1326977x |
||
| 999 |
_c326470 _d326470 |
||