| 000 | 01070nam a2200313 a 4500 | ||
|---|---|---|---|
| 005 | 20250913093746.0 | ||
| 008 | 981208s1996 xxka 00 eng | ||
| 020 |
_a0749417013 _cRM468.60 |
||
| 039 | 9 |
_a200402281213 _bbedah _c200105250949 _drahman _y08-18-1999 _zload |
|
| 090 | _aTS156.6.S851n 1996 9HUKM j.2 | ||
| 090 | _aTS156.6 | ||
| 100 | 1 | _aStewart, James R. | |
| 245 | 1 | 4 |
_aThe 90-Day ISO 9000 implementation guide : _bthe basics / _cby James R. Stewart, Peter Mauch and Frank Straka |
| 246 | 3 | _aNinety days ISO 9000 implementation guide | |
| 260 |
_aLondon : _bKogan Page, _c1996 |
||
| 300 |
_a2 v. : _bill. ; _c31 cm. |
||
| 650 | 0 |
_aQuality control _xStandards |
|
| 650 | 0 |
_aQuality assurance _xStandards |
|
| 650 | 0 | _aISO 9000 Series Standards | |
| 700 | 1 | _aMauch, Peter | |
| 700 | 1 | _aStraka, Frank | |
| 907 |
_a.b10002522 _b2020-10-12 _c2019-11-11 |
||
| 942 |
_c01 _n0 _kTS156.6.S851n 1996 9HUKM j.2 |
||
| 998 |
_ah _b1999-05-08 _cm _da _feng _gxxk |
||
| 914 | _avtls000000291 | ||
| 990 | _aHZ | ||
| 991 | _aPerpustakaan Hospital Cheras | ||
| 999 |
_c2297 _d2297 |
||